Lime bonds by soaking into porous mineral material. Latex and acrylic paint, and the paper face of drywall, give it nothing to soak into, so those walls need the primer the product calls for before the limewash goes on. On new board that typically means a drywall primer followed by the mineral or bonding layer, and sound existing paint frequently needs the bonding layer alone. A primer tinted toward the finish color stops thin patches from flashing bright white.
The primer can only hold if what is under it holds. We wash off grime and grease, fill and sand repairs, and test how well the old paint is stuck before anything else. Glossy enamel may need sanding, and peeling or chalky paint must be removed or stabilized. Some limewash lines are made for unpainted masonry only and are not used on drywall at all.